SPESYN - VIP Pre-Order Deposit

Pay $5 today, get $20 toward your final order, and lock in 20% off before preorder pricing changes.

$5.00 VIP Pre-Order Ends Sept 30
Choose Your Edition

Free Gift

Gift Free gift: ST3 Carrying Strap Free gift: ST3 Carrying Strap Exclusive to deposit customers. SPESYN Carrying Strap value $29.90, yours free. $0 $29.90

VIP Reservation & Guarantee:

  • Pre-Launch Deposit Offe: Pay a $5 deposit and unlock $20 in credit toward your final payment.
  • Exclusive Early-Bird Pricing: Lock in 20% off the retail price — bringing your final price down to just $203.
  • Priority Production Slot: Your deposit reserves your place in our production queue on a first-come, first-served basis. (Note: this is a pre-order — no product ships immediately.)
  • Premium Gifts Included: Receive exclusive gift bundles worth up to $29.9.
  • Risk-Free Promise: Changed your mind? Get an immediate, no-questions-asked refund anytime before your final payment.

*Limited to one deposit per customer. Duplicate deposits will be automatically refunded.

Production & Delivery

Production is currently underway.

Kickstarter orders: Estimated to begin shipping around late-September 2026.
SPESYN website orders: Currently expected to begin fulfillment around October.

These are our latest production estimates and may shift as manufacturing and fulfillment progress. We’ll keep this page updated if the schedule changes.

Next update: Sep.17, 2026

Shipping

For shipping areas and fees, please refer to: Shipping Policy

VIP Pre-Order Deposit VIP Pre-Order Ends Sept 30
$5.00

ST3 Production Journey

Follow every milestone behind ST3 — from engineering updates to production progress.

Precision Mold Manufacturing Started

Precision Mold Manufacturing Started

The ST3 moved from design validation into production preparation, with high-precision molds being developed for key structural components.

Metal Finishing in Progress

Metal Finishing in Progress

Several ST3 metal components entered coating and surface finishing to improve durability, wear resistance, corrosion protection, and long-term reliability.

Battery Pack Assembly & Validation

Battery Pack Assembly & Validation

The removable battery system moved into assembly and validation, including fit checks, connection reliability, charging performance, and protection testing.

Main Unit Assembly Underway

Main Unit Assembly Underway

The ST3 entered main unit assembly, bringing together the housing structure, motor system, control components, internal wiring, trigger system, and front-end assembly.

Drop-Resistance Testing Underway

Drop-Resistance Testing Underway

As more complete ST3 units move through validation, drop-resistance testing is now underway to evaluate how the tool holds up against unexpected impacts and drops in real workshop use.

Reserve Your Spot Early

VIP pre-order — limited window, extra perks
VIP Pre-Order
Public Pre-Order Public Pre-Order
Deposit Value
$5 Deposit → $20 Store Credit
Bonus Gift
Free ST3 Carrying Strap Included
Shipping Priority
First-Batch Priority
Refundable Deposit

How The Deposit Works

How the ST3 deposit works timeline

90°

Mechanical Vertical Guidance

SPESYN ST3 90° mechanical vertical guidance

±0.1mm

Depth Display Real-Time

SPESYN ST3 real time depth display

90°

Mechanical Vertical Guidance

SPESYN ST3 90° mechanical vertical guidance

Real-Time

Depth Display

SPESYN ST3 real time depth display

20

Level Torque Control

SPESYN ST3 20 level torque control

52-Min 

Runtime³

SPESYN ST3 52min lasting battery life

3-in-1

Workflow

SPESYN ST3 3-in-1 workflow

20

Level Torque Control

SPESYN ST3 20 level torque control

3-in-1

Workflow

SPESYN ST3 3-in-1 workflow

52-Min 

Runtime³

SPESYN ST3 52min lasting battery life

STL

Open Guide System

SPESYN ST3 open guide system

Auto-Tapping Mode

Auto-reverse prevents overdriving

SPESYN ST3 auto tapping mode

STL

Open Guide System

SPESYN ST3 open guide system

Auto-Tapping Mode

Auto-reverse prevents overdriving

SPESYN ST3 auto tapping mode

³ Lab tested · Air-load continuous operation

Built into The Tool, Not The Operator.
PRECISION

Built into The Tool, Not The Operator.

Perfectly Vertical. Every Time.

A front guide module and dual linear rails physically hold your drill vertical - so precision comes from the tool, not your hands.

Vertical guidance

Drill deep. Know exactly how deep.

With real-time depth readout down to 0.1mm, ST3 takes the guesswork out of blind holes. No more over-drilling - just clean, repeatable precision.

530 in-lbs Max Torque
±0.1mm Depth Display Real-Time
2000 Max Speed (RPM)
Depth display
3-IN-1

Drill, Tap, and Drive in One Guided Workflow.

Drill:

Mechanical guidance keeps the bit vertical while the depth display keeps the cut controlled.

Tap:

Auto-reverse helps protect the bit and produce cleaner threads.

Drive:

Torque control and vertical guidance help screws land straight.

Built for Every Job.

Workshop, garage, job site, or home — ST3 adapts to every space and every trade.

Questions Before You Reserve?

Clear answers on refunds, final payment, credit, shipping, and why your card will never be charged without your confirmation.

Your estimated balance for the Standard Edition is $203.20: MSRP $279 minus 20% OFF, then minus your $20 deposit credit. You pay the balance when preorder opens. We will send a 7-day email reminder first, and your card is charged only after you actively confirm.

Specs

SPESYN Tool 3
Product Name SPESYN Tool 3 (ST3)
Product Type Cordless Drill / Driver / Tapping Tool
System Voltage 20V MAX
Rated Voltage 18V d.c.
Chuck Capacity Ø13 mm
No-load Speed — Tapping 0–400 RPM
No-load Speed — Screwdriving 0–500 RPM
Minimum Controllable Speed — Screwdriving 15 RPM
No-load Speed — Drilling 0–2000 RPM
Core Functions Drilling, screwdriving, and tapping
Motor System Sensored high-performance brushless motor
Electronic Control Electronic clutch with intelligent torque control for improved drilling, screwdriving, and tapping performance
Torque Protection Audible Alert Supported
Precision Guidance System Detachable Front Guide Module (FGM) with dual guide rails for improved perpendicularity and stability during drilling and tapping
Dust Collection Support Front Guide Module supports dust collection
Alignment Capability 90° precision alignment to the work surface for improved vertical drilling and tapping consistency
Depth Control Real-time depth display with one-touch zeroing for blind-hole drilling and tapping applications
Depth Accuracy ±0.1 mm relative depth accuracy
Auxiliary Stabilizer Bar Supported
Lighting Dual auxiliary lights, 0.5 W each
Display / HMI Integrated LCD display for operating status and depth readout
Charging Interface USB-C fast charging
Battery Configuration Replaceable battery system
Mounting Interface 1/4"-20 threaded accessory port
Net Weight 1.2 kg excluding battery and auxiliary bar
Tool Architecture Modular and expandable platform
Expandability Supports different bit lengths, tap sizes, drilling angles, and accessory attachments
Typical Work Materials Metal, wood, plastic, PVC, tile, and glass
Typical Applications Precision drilling, blind-hole drilling, controlled tapping, self-tapping screw installation, and general fastening

* Under continuous iteration. The official release parameters shall prevail.